All questions

MCAWS Marine Corps Cannoneer Course (MCCC) Practice Test

Browse all practice questions for the MCAWS Marine Corps Cannoneer Course (MCCC) Practice Test. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

MCAWS Marine Corps Cannoneer Course (MCCC) Practice Test 2026 – Complete All-in-One Guide to Exam Success! course image
All questions

These questions are part of the practice quiz. Start practicing

  • Which sub-component of the DFCS provides an interface between all other DFCS components?
  • What information does the FDC typically rely on from the observer to compute firing data?
  • ETWD determines the sustained rate of fire as 2 rounds per minute.
  • The M777A2 howitzer weighs ________ pounds without basic issue items, with HyPAK.
  • Which marks must be aligned to verify priming readiness on Cannoneer #2?
  • What is the primary effect of High Explosive rounds?
  • Which sub-component of the DFCS allows you to toggle between Off, Aux, Comm, and DFCS?
  • The statement Cannoneer #1 leaves the Lanyard attached to the firing lever after the first round to facilitate quicker firing is true or false?
  • The fire command __________ is always given, but never recorded.
  • Who can deliver corrections for artillery fire, and how are corrections communicated?
  • What type of ammunition is used with the M777A2 howitzer?
  • What elements of a fire command can be standardized to expedite the delivery of fires?
  • Once activated, the M762 and M767 series fuzes have a _____ day service life before the battery runs down and the LCD goes blank.
  • Which component does the A-Gunner apply the announced Quadrant to after receiving a fire mission?
  • What is the difference between time fuze and impact fuze?
  • The Digital Fire Control System (DFCS) is comprised of how many sub-components?
  • If the far aiming post is placed at 100 meters, the near post would be placed ______ meters from the pantel.
  • Which element denotes the amount of propellant to be used and can never be standardized?
  • Which element is used when actions other than normal are required in a fire command?
  • What is a 'charge' in artillery, and how is it selected?
  • What determines Fire Mission Priority?
  • The M732A2 PD range can include which configuration?
  • How does wind influence artillery trajectories and how is it corrected?
  • What is a Preliminary Fire Plan?
  • Cannoneer #2 attaches the firing lanyard to the firing lever on the Section Chief's command of, 'STAND BY'.
  • Which statement best contrasts grid and polar target location methods?
  • Which data element directly controls the horizontal aiming angle of the gun?
  • The Top Cradle Electronic Assembly is located on top of the howitzer and consists of the CLA-MCR, CLE, RTA, GPS Antenna, and IPIK.
  • Who verifies the Shell/Fuze combination, Charge, Deflection, and Quadrant with the Section Chief?
  • Which step immediately precedes the Gunner's announcement of Deflection (whatever), Ready?
  • Before priming, alignment of the Primer Feed Mechanism witness marks must be verified.
  • The M732A2 can be set to PD or:
  • What primarily determines muzzle velocity in artillery?
  • The maximum range of the howitzer when utilizing a rocket assisted projectile is 24,000 meters.
  • When does Cannoneer #2 swab the powder chamber, gas check seat, and spindle?
  • What is a spotting round and when is it used?
  • During Boresight Verification, the A-Gunner installs the M154 on the dove tail mount.
  • Ammunition expended during a fire mission will be annotated in the Fire Mission Data Section.
  • What does IPCCM stand for?
  • Who announces the 'READY DROP' during the procedure?
  • How often must the DA Form 4513 be completed and turned in?
  • Which part is explicitly identified as the Primer Feed Mechanism Lever in the system?
  • Which of the following is NOT a DFCS mode?
  • Which item is NOT one of the four elements of a complete round?
  • Which form is used to verify the Quadrant data during the process?
  • What is the primary purpose of a time delay fuze in a HE round?
  • Which crew member is assigned the task of receiving the M1A2 collimator and pantel after the prime mover operation ends?
  • What mechanism does Cannoneer #1 use to lower the loading tray when Cannoneer #4 says 'READY DROP'?
  • Why must range safety be enforced at all times during artillery operations?
  • In artillery, what does it mean to lay a gun?
  • What does a grid coordinate represent in targeting?
  • The maximum rate of fire is 4 rounds per minute for 2 minutes, and the sustained rate of fire is 2 rounds per minute (determined by the ETWD). This statement is:
  • Which target location method uses range and bearing from a reference point?
  • The statement 'The Vehicle Motion Sensor is located on the left side of the howitzer, right below the traversing handwheel' is true.
  • Which component stores the muzzle velocity results for the 200 most recently fired rounds?
  • Which of the following is least relevant to the process of zeroing a gun?
  • Which DA Form part consists of the 11 elements of the fire command?
  • What is the purpose of a target location method, such as grid or polar coordinates?
  • What type of recoil mechanism does the M777A2 howitzer have?
  • Which element describes how fire is delivered in a fire plan?
  • The Recorder receives and records all mission data on which form?
  • After closing the breech and aligning Breech Witness Marks and hearing STAND BY, Cannoneer #2 primes the howitzer using the __________.
  • Which action is performed first upon hearing a Quadrant Set announcement by the A-Gunner?
  • How does weather impact external ballistics computations?
  • The fire command 'Fuze' designates the setting to be applied to the fuze.
  • Cannoneer #3 places the projectile onto the loading tray only after verification by the Section Chief.
  • Which element designates pieces/rounds anticipated to fire in the fire for effect phase?
  • Which action is essential to safety and accountability after firing?
  • Which coordinate references are used when reporting target bearing to FDC?
  • Which cannoneer is responsible for swabbing the powder chamber, gas check seat, and spindle after every round?
  • What is meant by a “checkfire” and when would it be used?
  • Which item completes the blank in the list of the eleven elements of a fire command: Warning Order, Pieces to Follow/Pieces to Fire/Method of Fire, __________, Projectile, Ammunition Lot, Charge, Fuze, Fuze Setting, Deflection, Quadrant, and __________?
  • The Vehicle Motion Sensor is located on the left side of the howitzer, right below the traversing handwheel. True or False?
  • Which propelling charge is green in color?
  • When storing ammunition, there should be at least ___ inches of clearance over, and ___ inches of clearance on the sides at all times.
  • What is the maximum safe towing speed on improved roads?
  • How does observation quality affect the accuracy of firing?
  • How does fuse timing affect HE rounds at different ranges?
  • Which part of the DA Form contains total ammunition count and lot code designators?
  • Which sub-component of the DFCS is needed to program precision-guided munitions?
  • The two types of fire commands are which?
  • How should ammunition be stored and handled safely?
  • What is the purpose of using observed corrections when calculating a ballistic solution?
  • Which Cannoneer selects and prepares the commanded shell/fuze combination?
  • When charging the Scavenge System, the desired pressure to obtain is
  • The _______________________ calculates muzzle velocity and allows the DFCS to store the results of the 200 most recently fired rounds.
  • Which factor does Time of Flight not depend on?
  • The purpose of fire commands is to save time and eliminates errors (confusion) between the FDC and the gun line. True or False?
  • Which element provides permission to load, lay, and fire unless restricted by special instructions?
  • Which Cannoneer is responsible for announcing 'READY, RAM' after the round passes the Swiss Groove?
  • What is the primary role of the Fire Direction Center (FDC) in a cannon battery?
  • After the Section Chief announces 'I SEE RED', Cannoneer #2 closes the breech utilizing which component, and ensures witness marks are aligned?
  • Which two Cannoneers emplace the aiming posts during emplacement?
  • Upon receipt of a fire mission, the Gunner repeats the announced Deflection and applies it to the Deflection Counter of the M137A2 Panoramic Telescope.
  • The M110 series WP projectile has a Bursting Tube Explosive Train.
  • What action occurs when Cannoneer #4 announces Ready, Drop?
  • During loading, propellant must be seated past which feature?
  • What action should be taken if a target is danger close to friendlies during a mission?
  • What tool is used to mate the M1156 PGK to projectiles?
  • The Driver observes and announces 'BORE CLEAR' immediately after initial receipt of 'FIRE MISSION' and at 'END OF MISSION'. True or False?
  • What is the purpose of a “no-fire” command?
  • What is the nomenclature of the firing mechanism used with the M777A2 howitzer?
  • What are the three fundamental firing data elements used to place a round on target?
  • How should a gun crew adjust fire when the target is behind a range obstruction?
  • What is the target pressure for charging the Scavenge System?
  • Cannoneer #2 loads the propellant into the cannon tube and ensures it is seated past which feature?
  • The maximum distance for the far aiming post is 200m.
  • The M767A1 is categorized as which type of fuze?
  • What does Cannoneer #2 announce after the propellant is loaded?
  • Where ammunition fired is recorded on the DA Form?
  • Why is map reading and plotting essential in artillery operations?
  • What should be announced by the Section Chief before Cannoneer #2 primes the howitzer?
  • Cannoneer Number 3 and Assistant Gunner stow trail arms during displacement.
  • Which instrument contains the Deflection Counter used when applying deflection after receiving a fire mission?
  • Which environmental factors affect external ballistics computations?
  • The statement 'Upon receipt of a fire mission, the Gunner repeats the announced Deflection and applies it to the Azimuth Counter' is which of the following?
  • After activation, the M762 and M767 series fuzes have a service life of how many days?
  • The High Angle instruction is used when the quadrant elevation is equal to or higher than ______ mils.
  • Upon verification from the Section Chief, Cannoneer #3 places the projectile on to the loading tray. True or False?
  • The _______ allows cannoneers to load and extract primers during fire mission cycles.
  • What is the nomenclature of the only authorized primer used with the M777A2 howitzer?
  • Which option best describes the recoil system of the M777A2?
  • Which type of ammunition is used to illuminate an area during nighttime operations?
  • What propelling charge is an individual, bi-directional charge, green in color, and has a center core igniter encased in a rigid combustible case?
  • What does deflection mean in firearm aiming?
  • During boresight verification, the A-Gunner installs the M154 on the dove tail mount.
  • In the field firing procedure, which component is used to apply the announced deflection to the azimuth?
  • What is the designation of the panoramic telescope used with the M777A2?
  • Cannoneer #4 brings up the prepared shell/fuze combination for verification and loading. True or False?
  • Upon the Section Chief's announcement of which sequence, Cannoneer #2 closes the breech and announces the status?
  • What is Time of Flight (TOF) and what factors influence it?
  • The Recorder verifies the Quadrant 563 from the DA Form 4513 and announces Quadrant 563 verified.
  • Which of the following best describes the Fire Direction Center's role during the execution phase of a firing mission?
  • The Recorder verifies the Shell/Fuze combination, Charge, ________, and Quadrant with the Section Chief from the DA Form 4513.
  • Which cannoneers apply the handbrakes on the M777A2 howitzer during emplacement?
  • The statement 'The M232A1 can be fired from zone 3 through 5' is correct.
  • After firing the first round, Cannoneer #1 leaves the Lanyard attached to the firing lever to facilitate quicker firing of subsequent rounds. True or False?
  • Which data element directly controls the vertical aiming angle of the gun?
  • Which statement correctly describes a Preliminary Fire Plan?
  • After the loading tray is lowered and the round is pushed past the Swiss Groove, Cannoneer #4 announces 'READY, RAM'.
  • Which maintenance action is required for the Primer Vent Hole after each fire mission or primer magazine change?
  • If you need to increase the vertical angle to hit a higher target, you would adjust which parameter?
  • What tool can be used to set the M767A1 electronic time fuze besides by hand?
  • Define ‘danger close’ in artillery and its implications for fire control.
  • Upon receipt of a fire mission, the A-Gunner repeats the announced Quadrant and applies it to the M18A1 Fire Control Quadrant.
  • The M777A2 on-carriage elevating range spans from which to which mils?
  • Who provides target location and corrections to the Fire Direction Center (FDC) during an engagement?
  • Which Cannoneer selects and prepares the commanded propelling charge?
  • What is the upper bound in mils of the M777A2 on-carriage elevating range?
  • What should you do if you receive a misfire after loading?
  • After traversing the tube to achieve proper sight picture with the aiming point and the M171A1 is level, the Gunner will announce Deflection (whatever), Ready.
  • What is the difference between an Immediate Fire Mission and a Planned/Deliberate Fire Mission?
  • Upon receipt of a fire mission, the Gunner repeats the announced Deflection and applies the Deflection to the __________ Counter?
  • What are the primary responsibilities of the Gun Commander in a firing mission?
  • What elements are typically included in a fire data sheet?
  • The state of charge of the DFCS can be read from which of the following?
  • In the acronym TLABSPAP, what does the second 'A' stand for?
  • What is Counter-Battery Fire and when is it used?
  • What are the roles of a Spotter/Observer during a fire mission?
  • What is the maximum safe towing speed cross country?
  • How many elements are in a standard fire command?
  • Where should a spotting round be fired from?
  • During the second "A" of TLABSPAP, Cannoneer #3 emplaces the collimator 6-9 meters from the pantel. True or False?
  • Who observes impacts and communicates corrections to refine subsequent rounds?
  • What is the maximum safe towing speed on secondary roads?
  • The state of charge of the DFCS can be found on either the CSD-R or the IPCCM. Which of the following describes where it can be found?
  • In the field, what is used to verify or compute a ballistic solution?
  • Differentiate between High Explosive (HE) rounds and Illumination rounds.
  • The Assistant Gunner's Display provides a menu driven interface between the DFCS and the Section Chief.
  • The nomenclature of the Panoramic Telescope used with the M777A2 howitzer is:
  • Who generally authorizes and prioritizes a fire mission under fire support planning?
  • When a checkfire is issued in the field, what is the recommended action?
  • The only authorized fuze for use with base ejection projectiles is which of the following?
  • What is a fire mission and who typically initiates it?
  • The shipping and storage setting for the M782 is:
  • Which Cannoneer places the projectile onto the loading tray after verification from the Section Chief?
  • During Boresight Verification, the A-Gunner installs the ______ on the dove tail mount.
  • Which phrase confirms breech closure and witness marks alignment?
  • What is the goal of an 'adjust fire' maneuver?
  • During a fire mission, what is the role of the Assistant Gunner (AG)?
  • What determines the timing and method of a Planned/Deliberate Fire Mission?
  • Which personnel verify before Cannoneer #2 loads the propellant?
  • If a target is obscured by a terrain feature, what correction approach is recommended?
  • What does 'zeroing' a gun achieve?
  • How does trajectory differ between high-angle and low-angle fire?
  • The M767A1 electronic time fuze can be set by hand or with the M18 combination fuze-wrench and setter. True or False?
  • Why is ammunition accounting after a firing mission essential?
  • Who receives the M1A2 collimator and pantel after exiting the prime mover?
  • Why is discipline in radio communications critical during artillery firing?
  • Which outcome best describes the role of a Range Safety Area when cannons are firing?
  • Which sub-component assists with the howitzer's ability to self-locate, as well as determines pointing data (azimuth/deflection and elevation/quadrant)?
  • Who is responsible for selecting and preparing the commanded shell/fuze combination?
  • Which DFCS component serves as the interface hub among all DFCS components?
  • What is the purpose of a Range Safety Area (RSA) around cannons?
  • If air density changes due to weather, what adjustment is required in ballistic data?
  • Upon receipt of a fire mission, the Gunner repeats the announced Quadrant and applies it to the M18A1 Fire Control Quadrant.
  • Which two safety steps are performed before loading ammunition?
  • Which checks should be performed after a firing mission before the gun crew moves?
  • Which element of the fire command gives the Section Chief the permission to load and fire unless restricted by Special Instructions?
  • Cannoneer #1 lowers the loading tray when Cannoneer #4 announces ___________.
  • What document does the Recorder verify Quadrant data against?
  • The 4 elements of a complete round are: Fuze, Projectile, ________, and Primer.
  • The statement 'The device installed on the dove tail mount during boresight verification is the M154' is true.
  • How do you measure and report target bearing in field conditions?
  • What is the first action in a misfire procedure and what is its purpose?
  • Which part of the DA Form contains section, date, page, standard data?
  • The M777A2 howitzer's two positions (configurations) are __________ and __________.
  • Which Cannoneer is responsible for announcing, 'BORE CLEAR'?
  • What is the role of a spotter in verifying the impact area?
  • Which statement best distinguishes internal ballistics from external ballistics?
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy